Civil, water resources, structural and construction engineering

Engineering that holds up in the field.

Pacifica Engineering is a multidisciplinary engineering firm based in Rocky Mount, North Carolina. We work with owners, developers, contractors and public agencies to plan, design and build sites and facilities across the state.

Disciplines

Our approach

Most project problems start where one discipline hands off to another.

Each of the situations below leads to redesign, delay or a change order. We avoid them by keeping civil, water, structural and construction engineering under one project lead, who stays involved from the first site visit through final inspection.

Read about our approach

A grading plan assumes a pipe size that the stormwater model never checked.

New equipment arrives before anyone has confirmed the slab can carry it.

Drawings pass agency review and then conflict with conditions on site.

Project delivery

How we carry a project from feasibility to closeout

Engineering has the most influence early, before the layout, budget and schedule are set. We stay involved after that so the design intent is carried through construction.

  1. STA 0+00

    Feasibility

    What will this site support?

    We review soils, floodplain, utilities, access and the permitting path before you commit to a layout.

    DeliverableConstraints memo

  2. STA 1+00

    Design basis

    What are we designing to?

    Loads, criteria and assumptions are agreed in writing at the start of design.

    DeliverableBasis of design

  3. STA 2+00

    Design and permitting

    Will it pass review and can it be built?

    Coordinated drawings that agencies can approve and contractors can price accurately.

    DeliverablePermit and construction drawings

  4. STA 3+00

    Construction

    How do we resolve this in the field?

    Prompt responses to RFIs, submittals and the conditions crews find on site.

    DeliverableRFI responses and field reports

  5. STA 4+00

    Closeout

    Was it built as designed?

    Final observations, record drawings and the certifications owners and agencies require.

    DeliverableRecord documents

Headquarters

Based in Rocky Mount, working across North Carolina

Rocky Mount sits where I-95 meets US 64, about an hour east of Raleigh. From here we serve the manufacturing plants, distribution sites, rail corridors and river towns of eastern North Carolina, and we take on projects statewide when the scope is a good fit.

Corridors
I-95, US 64 and US 301
Raleigh
About one hour by car
Service area
Eastern North Carolina and statewide
Pacifica Engineering service regionSchematic map of eastern North Carolina centered on Rocky Mount, showing I-95, US 64, US 264, the Tar River, and nearby cities including Raleigh, Wilson, Greenville and Tarboro, with rings at 25 and 50 miles.25 MI50 MII-95I-95US 64US 64US 264I-795TAR RIVERTAR RIVERRaleighWilsonGreenvilleTarboroNashvilleRoanoke RapidsGoldsboroWilliamstonWashingtonSmithfieldLouisburgROCKY MOUNTHEADQUARTERSSCHEMATIC, ROUTES SIMPLIFIED025 MIN
How we work

Practices we hold to on every project

  • We identify the hard constraints first.

    Soils, floodplain, utility capacity and access are reviewed before a layout is fixed.

  • We document decisions.

    Assumptions, criteria and tradeoffs are recorded so the whole team works from the same information.

  • We design for construction.

    Drawings account for sequence, access and tolerances as well as code requirements.

  • We stay through closeout.

    The engineers who designed the work answer the RFIs and observe construction.

Start a project

Tell us about your site and schedule.

Send us the project location, where things stand and the decision you need to make. We will follow up to discuss scope and next steps.